NC State Mann Hall Renovation
About the Project
The Mann Hall Renovation project includes a complete interior abatement and demolition scope of the existing building followed by construction of fully re-programmed classroom, academic and study spaces, fourth floor laboratory space, and an E-Sports arena all on NC State's Main Campus.
To support the re-programming of this building, a new mechanical penthouse will be constructed to feed the fourth-floor labs and a new elevator shaft will be installed (in addition to replacing the existing cab within a separate shaft). New electrical and mechanical equipment will be required, including replacing the existing transformer, and new fiber will be pulled from the existing manhole to support E-Sports needs.
NC State is currently under contract (as part of a separate project) to replace the exterior glass and perform structural repairs, this scope is scheduled for completion August 2024.