About the Project

The Mann Hall Renovation project includes a complete interior abatement and demolition scope of the existing building followed by construction of fully re-programmed classroom, academic and study spaces, fourth floor laboratory space, and an E-Sports arena all on NC State's Main Campus.

To support the re-programming of this building, a new mechanical penthouse will be constructed to feed the fourth-floor labs and a new elevator shaft will be installed (in addition to replacing the existing cab within a separate shaft). New electrical and mechanical equipment will be required, including replacing the existing transformer, and new fiber will be pulled from the existing manhole to support E-Sports needs.
NC State is currently under contract (as part of a separate project) to replace the exterior glass and perform structural repairs, this scope is scheduled for completion August 2024. 

 

The Prequalification Form is currently OPEN. Prequalification submissions are due Friday, January 24th at 5:00PM EST.

UPCOMING EVENTS

Subcontractor Outreach Event - 2/27/2025, 4:30 PM EST, McKimmon Center